Preloader: your browser does not support CSS. If images appear below, please disregard them.

New bridge in Cernay, France. System B, length 35m, width 3m.

Bridge over the Thur, 2007.
Trough bridge length: 35m, width: 3m. System B. The new "Füllstab"-railing was used for the first time. The railings are anodized. The swiveling in of the bridge has been done in about 10 minutes! The major of Cernay was the first one to enter the bridge.


Click on pictures to enlarge.

Seite wird geladen. Bitte einen Moment Geduld...